Entry Point Projects (EPPs) | GNI million | Job |
Private
Investment (RM million) |
Public Investment (RM million) |
|
1 | National Seaweed Nucleus | 420 | 13,788 | 359 | 182 |
2 | Sabah Agro Industrial Precint (SAIP) | 195 | 399 | 584 | 94 |
3 | Taman Kekal Pengeluaran Makanan (TKPM) | 35 | 479 | 13 | 47 |
4 | Integrated Marine Fish Culture | 710 | 1,981 | 804 | 21 |
5 | Swiflet Commercial Centre (SCC) | 405 | 7,648 | 167 | 13 |
6 | High Finned Grouper & Barramundi | 995 | 760 | 118 | 32 |
7 | Integrated Shrimp Aquaculture | 267 | 3,626 | 716 | 48 |
8 | Sea Cucumber & Tiger Grouper Combine Culture | 555 | 930 | 100 | 41 |
Total |
3,582 | 29,611 | 2,861 | 478 |
EPP 1 : NATIONAL SEAWEED NUCLEUS of Malaysia
EPP 2 : SABAH AGRO INDUSTRIAL PRECINT (SAIP)
EPP 3 : TAMAN KEKAL PENGELUARAN MAKANAN (TKPM)
EPP 4 : INTEGRATED MARINE FISH CULTURE
| Coconut |
Coffee | Rubber |
Tongkat Ali |
FRESH MARKET OF KUNDASANG
| VEGETABLE | SABAH FOOD
PARK
| FRUITS OF SABAH |
What to eat in Tawau | TREES |
Taman-TKPM
EPP 3 : TAMAN KEKAL PENGELUARAN MAKANAN (TKPM)
|
||||||
|
||||||
|
||||||
|
1 - TKPM MANDALIP AU (517 HA) |
Background Of The Project TKPM
Mandalipau, Papar. • The site is situated 25 km from Papar Town. • Overall area = 517 hectares • Acreage developed = 517 hectares (3 Phase) • Gazette for TKPM = year 2006; GN 78-2006 • In 2009 listed under the Sabah Development Corridors (SDC). • Current status- The final report on Design Plan (Preliminary Report) done by SABA Perunding S/B costing RM860,580.00 > SDC |
2 - TKPM SG. LOKAN (700 HA) |
Background Of The Project TKPM Sg.
Lokan • The site is situated 80 km from the Kinabatangan District , Sandakan City. • Overall area = 732.48 hectares • 1st Phase Develop = 400 hectares • 2nd. Phase Develop = 300 hectares • Gazette for TKPM = year 2005; GN 345-2005 • In 2009 listed under the Sabah Development Corridors (SDC). • Current Status- The final report on Design Plan (Preliminary Report) done by PY Konsep Perunding costing RM389,120.00 > SDC TKPM, Sg. Lokan, Plot Design
|
3 - TKPM SG. KOYAH (80 HA) |
Background Of The Project TKPM Sg.
Koyah • The site is situated 52 km from the Kinabatangan District, Lahad Datu town • Overall area = 80 hectares • Acreage developed = 80 hectares • Gazette for TKPM = year 2004; GN 47-2004 • In 2009 listed under the Sabah Development Corridors (SDC). • Current status- The final report on Design Plan (Preliminary Report) done by SARG Konsult S/B costing RM308,600.00 > SDC |
• Categorized under EPP 7 [Fruit &
Vegetable] • To alienate land permanently for tropical fruits production. • To give opportunity for private sector to be involved in fruits production • To give opportunity for local agropreneur to be involved in food crops production. • Anchor Vendor Concept. • Strengths of the Food crops sector: - Food security - BOT, Import vegetable & fruits higher than export - Food crisis - Geographical location of Sabah closer to Taiwan, Japan, Brunei (EAGA) and Korea - Sabah still lacking in food crops agropreneur - High demand of tropical fruits overseas • Production: Low vegetable & fruits exported, ( 1,487 mt /RM3.8 million (statistic 2008) • Distribution : Project focus to east coast Sabah (Div. Sandakan and Tawau), to softened the effect of vast expansion of Palm oil plantation (estimated acreage of palm oil plantation is over 93% cultivated on arable, suitable and fertile agri land (Agri statistics bulletin 2007. |
|